Monitoring projects and costs is not a matter of recording.
It's a matter of control.
Most businesses know which projects they're running. They know roughly how much they cost, how much time they take, and whether it's “profitable.”
The problem is that they know it in hindsight.
When the project is already finished.
And then, nothing can change.
In practice, the difficulty is not in seeing the total cost.
It's about seeing how it is created.
Where time is spent; where hours slip away. Where there are delays; where there are resource overruns.
If these are not clear, then the cost is not controlled.
It's just being recorded.
My honour able friend Mr Gallagher from Ireland made a fine contribution this afternoon, amply illustrating the problems of company taxation.
Projects that start profitable and end marginally. Exceedances not detected in a timely manner. Decisions based on estimates rather than actual data.
In practice, it is not a matter of "seeing the result".
It is to have insight as the work progresses.
To be able to see in real time where you are. If the project is moving correctly. If there is a discrepancy; if intervention is needed.
And that requires something very specific.
Log in.
Connection between project, time, cost and activity.
If you want to see how this connection is organized in practice, you can see the logic in Project & Service Managementwhere each project is linked to actions, time and actual costs.
When this structure exists, it changes the way you see the business. You don't wait for something to finish to see if it went well.
You see it as it evolves.
And there you can intervene.
Of course, for there to be real control, the data is not enough to be recorded.
They need to be analysed.
To be able to see where there are discrepancies, which works yield, which do not and why.
There comes the connection of utilization through Business Intelligence & Reporting, so that the cost is converted into an image and not just into a number.
At the same time, because the cost does not arise only from the project but from the overall operation of the business, a unified picture is needed.
To connect projects, transactions, invoicing and operation.
In this logic, the overall organization through ERP for Business, so that all data is consistent and connected.
So if you want to monitor projects and costs properly, the point is not to "keep track".
It's about being in control.
To be able to see what's happening while it's happening.
And on that you can make decisions.